May 18-20: UND is working with Caterpillar to commission the third generator being added to the NDUS Data Center. This work will cover the installation and testing of the PLC controls upgrade package for the CAT Paralleling switchgear. The NDUS Data Center will continue to operate normally during the commissioning.